Language :

ROTARY VALVE Maintenance Checklist for Chemical Plants

ROTARY VALVE Maintenance Checklist for Chemical Plants

H1: Essential ROTARY VALVE Maintenance Protocol in Corrosive Environments
Meta Description: Discover the 8-point maintenance checklist for ROTARY VALVE systems handling acids, alkalis, and solvents. Includes ASTM material standards and inspection intervals.

Critical Maintenance Tasks

  1. Daily:

    • Check purge gas pressure (0.2-0.35 MPa) 

      1
    • Monitor bearing temperature (<65°C)

  2. Weekly:

    • Verify rotor clearance with 0.4mm feeler gauge

    • Test emergency shutdown response time (<2s)

  3. Monthly:

    • Perform vibration analysis (ISO 10816-3 compliance)

    • Conduct helium leak test (sensitivity 1×10⁻⁶ mbar·L/s)

Material Degradation Alert

ChemicalSafe MaterialCorrosion Rate (mm/year)
98% H2SO4Hastelloy C276<0.1
40% NaOH316L SS<0.05
Chlorinated SolventsPTFE-linedN/A